Zonguldak OIZ · 2,000 m² plant
Home / Structural design

Structural design at the same table as fabrication

We prepare the structural calculations and drawings together with the team that will fabricate the steel, so nothing gets lost between calculation, drawing and shop.

123456ABC+3.00+6.00
What we prepare

From calculation to shop drawing

Preparing the structural design with the shop that will fabricate the steel reduces mismatches on site and late changes.

  • Structural calculation and reportTo TBDY 2018 and Eurocode 3
  • Seismic, wind and snow load analysisBased on the building's location and use
  • Foundation, base plate and anchor detailsWhere concrete meets steel
  • Connection details and shop drawingsDrawings our shop works from directly
  • Coordination with the engineering office on the permit designThe permit design is signed by the owner’s engineering office; we prepare fabrication and connection details to match it
q δ M
q · distributed loadδ · deflectionM · bending moment
Drawing set

What goes into a structural drawing set

Sheets taken from the 3D model become a shared language with the engineering office during permitting and with our shop. The examples below are illustrative.

1234ABC600060006000500050001ST FLOOR FRAMING PLAN
Grid and floor framing planÇİLİNGİR METAL · SCALE 1/100S-101

Grid lines, column positions, primary and secondary beams with the dimension chain. Everything on site is set out from these grids.

End plate 20 mm4 × M20 · 10.9Fillet weld a=6300BEAMCOLUMN
Beam-to-column connectionÇİLİNGİR METAL · SCALE 1/10S-301

End plate, bolt count and grade, weld size. The shop cuts, drills and welds from this sheet.

FOOTING (CONCRETE)Base plate 25 mmAnchor M24Grout 30 mm±0.00−0.03
Base plate and anchor detailÇİLİNGİR METAL · SCALE 1/10S-302

Where the column meets the footing: plate thickness, anchor bolts and grout level.

Process

From design to erection

  1. Design & calculation

    We work out the structural system and shop drawings from your architectural design.

  2. Shop fabrication

    Sections are cut to size, plates are drilled and connections are welded.

  3. Surface & coating

    Surfaces are cleaned, anti-corrosion paint is applied and every piece is labelled.

  4. Delivery & erection

    Pieces arrive on site in sequence and are bolted together; the frame rises within days.

Send us your project, let's talk steel

Whether you have drawings, dimensions or just an idea, we will map out the structural system and fabrication for you.

Address
Orhanlar Mah. Yalı Cad. No: 25
67300 Kdz. Ereğli / Zonguldak, Türkiye